© 2005–2026 ПАО НК «РуссНефть»

«Aganneftegasgeologia» will go on implementing the production drilling program

21.02.2011 "Tyumenskaya Linia”

Nizhnevartovsky District, KhMAO. OAO MPC “Aganneftegasgeologia” (a subsidiary of NK “RussNeft”) is going to continue in 2011 the production drilling program at the oilfields of the joint stock society, as well as at the oilfields of ST ZAO “Goloil” and OOO JV “Chernogorskoye”, the companies to which “Aganneftegasgeologia” renders operator’s services.

t is planned to drill ten production wells, three of them will be drilled applying the method of horizontal drilling. The total meterage will exceed 31 thousand meters of rock, says the press-service of OAO MPC “ANGG”.
The company is developing surface facilities of well-pads at the oilfields. At the oilfields Golevoye and Chernogorskoye land use engineering is being carrired on  for construction of well-pads NoNo 1 and 8.  At well-pads NoNo 20 and 5 of Roslavlskoye and Vostochno-Golevoye oilfields the company started well rigs mounting. Driiling at Roslavlskoye and Vostochno-Golevoye oilfields will start at the end of March.

More news

All Show all

RussNeft speaks about its work on personnel training

Qualified specialists are the basis for technological development and economic growth in the country. Professionals and masters of their craft are the driving force behind enterprises in all sectors of the economy.

Russneft reports on river restocking in the Khanty-Mansi Autonomous Okrug

The company's press service announced the completion of efforts to replenish the fish resources of the Ob River basin. A total of 80.5 thousand nelma and muksun fingerlings were released.

The "Volga Rainbow" has blossomed near Saratov - RussNeft continues to support children's creative initiatives

PJSC “RussNeft” continues to support socially significant projects in the regions. In Saratov, the now-traditional "Volga Rainbow 2026" project was launched at the Rovesnik health center under the Company's auspices.