© 2005–2026 ПАО НК «РуссНефть»

OAO “Ulyanovskneft” at Novobesovsky Preliminary Water Removal Unit (PWRU) carries out start-up operations of the flaring system.

12.04.2010 IA “Mozaika”

Ulyanovsk. OAO “Ulyanovskneft”, a subsidiary of OAO NK “Russneft”, puts into operation the flaring system at Novobesovsky PWRU. A new project flaring system is equipped with automatic remote control unit located in the control room.

The regulation of the parameters of gas outlet in the pipelines of flare system at the territory of oil gathering station is accomplished with the help of automatic blocking and regulating devices. For the emergency firing up of the flaring system gas line supply with natural gas is provided. Specialized organizations implement installation, testing and putting into operation the new flaring system in strict accordance with “ Safety regulations of gas distribution and gas consumption systems”. Putting into operation the project flambeau light at Novobesovskoye PWRU will considerably improve the personnel’s working conditions and will ensure  industrial safety, labor protection and ecology requirements.

More news

All Show all

RussNeft speaks about its work on personnel training

Qualified specialists are the basis for technological development and economic growth in the country. Professionals and masters of their craft are the driving force behind enterprises in all sectors of the economy.

Russneft reports on river restocking in the Khanty-Mansi Autonomous Okrug

The company's press service announced the completion of efforts to replenish the fish resources of the Ob River basin. A total of 80.5 thousand nelma and muksun fingerlings were released.

The "Volga Rainbow" has blossomed near Saratov - RussNeft continues to support children's creative initiatives

PJSC “RussNeft” continues to support socially significant projects in the regions. In Saratov, the now-traditional "Volga Rainbow 2026" project was launched at the Rovesnik health center under the Company's auspices.