© 2005–2026 ПАО НК «РуссНефть»

Aganneftegazgeologiya prepares for drilling on Roslavlskoye field

27.04.2012 “UralInformBureau”

Nizhnevartovks region, KhMAO. OAO MPC Aganneftegazgeologiya commenced preparatory works for horizontal directional drilling on Pad 20 of Roslavlskoye field. The work is performed within the program for drilling of producing wells.

A drilling rig is being installed on the site; materials and equipment required for the well construction are delivered.

Commencement of the well No 1098 drilling is scheduled for the second decade of May. Its depth is designed to be 3,498 m, the length of the horizontal section will be 500 m. BV8-1 horizon will be penetrated by drilling, press service of OAO MPC ANGG informs.

Roslavlskoye field has been under commercial development since 2000, its operation stock is 50 oil producing wells. Commissioning of a new well will allow Aganneftegazgeologiya to stabilize the volumes of the produced oil and increase the performance indicators.

More news

All Show all

RussNeft speaks about its work on personnel training

Qualified specialists are the basis for technological development and economic growth in the country. Professionals and masters of their craft are the driving force behind enterprises in all sectors of the economy.

Russneft reports on river restocking in the Khanty-Mansi Autonomous Okrug

The company's press service announced the completion of efforts to replenish the fish resources of the Ob River basin. A total of 80.5 thousand nelma and muksun fingerlings were released.

The "Volga Rainbow" has blossomed near Saratov - RussNeft continues to support children's creative initiatives

PJSC “RussNeft” continues to support socially significant projects in the regions. In Saratov, the now-traditional "Volga Rainbow 2026" project was launched at the Rovesnik health center under the Company's auspices.