© 2005–2026 ПАО НК «РуссНефть»

“Saratovneftegas” completed reconstruction of tubing repair site.

06.07.2007 "Saratovbusinessconsultiong"

Nowadays the cost of any tubing, including oilwell tubing used in oil and gas industry, is very high. For this reasons many plants prefer to repair existing tubing rather than to buy new one. In 2006 ZAO “Service-Center NP & BO” (a subsidiary of OAO “Saratovneftegas”) reconstructed and put into operation a tubing repair site. But until recently there was no possibility to perform all the operations of the technological process at the site.

In May – June the tubing repair site was reconstructed and it permitted tp create a single technological line, excluding long hold-ups for relocation of a tube in order to perform certain operations. The company purchased and installed equipment for cleaning the tubes of petrochemical and bituminous deposits, a pumping station for hydraulic testing of the tubes. In near future it is planned to purchase a set of instruments for complete ultrasonic control over the tubing.

More news

All Show all

RussNeft reports on its chemical analysis laboratory competence confirmation with RusAccreditation.

PJSC “RussNeft” issued a press release announcing the completion of a series of activities to certify the competence of its Ulyanovsk branch`s chemical analysis laboratory with the Federal Accreditation Service.

RussNeft names winners of the 3rd Scientific and Technical Conference for Young Professionals

The professional panel of PJSC “RussNeft” has decided the winners of the Company`s Scientific and Technical Conference for Young Professionals.

RussNeft continues to implement educational projects for schoolchildren

PJSC “RussNeft” continues to implement educational projects. According to the company`s press service, schoolchildren from the regions where the company`s enterprises operate took part in an educational project implemented by the Company jointly with the Gubkin Russian Oil and Gas University since 2010.