© 2005–2026 ПАО НК «РуссНефть»

Long way to the Church

Ulyanovsk. Operational meeting appointed at 8 am started with a big delay due to the fact that early in the morning the governor visited the building ground of the Savior and Ascension Church at Minaev street in order to control the construction in person. The construction extended for twenty long years should be completed by the appointed term – November 2013.
02.08.2013 Ulyanovskaya Pravda

OAO NK RussNeft and Russian State University of Oil and Gas named after Gubkin continue implementation of the joint educational project

Raduzhny, KhMAO. In July 2013 eleven students of the Regional Preparatory Department (APD), at the basis of Varioganneft became students of the faculties "Geology, geophysics, oil and gas," "Development of oil and gas fields", "Engineering Mechanics" of the prestigious Russian University of Oil and Gas named after Gubkin.
31.07.2013 "Neftegazovaya Vertical”

An emergency liquidated during training at a production facility of Ulyanovskneft

Ulyanovsk. OAO Ulyanovskneft, a subsidiary of OAO NK RussNeft, held special tactical exercise on emergency response to hazardous production facilities.
29.07.2013 Delevoye obozreniye Ulyanovsk

Varioganneft is implementing energy saving and energy performance raising program at the oilfields of Variogan block

Raduzhny, KhMAO. OAO Varioganneft, a subsidiary of OAO NK RussNeft, is implementing energy saving and energy performance raising program at the oilfields of Variogan block, as the company press-service reported to “Samotlor-Express” agency.
25.07.2013 "Neftegazovaya Vertical”

RussNeft intends to increase its oil production in Tomsk region by 11% this year

Tomsk. OOO Tomskaya neft (subsidiary of OAO NK RussNeft (PTC: RUSN) in Tomsk region) intends to increase the oil production by 11% to 1.16 mln tons.
24.07.2013 Interfax