Nizhnevartovsk District, KhMAO. In 2011 more than 7 million 600 thousand rubles will be directed by Nizhnevartovsk enterprises of NK “RussNeft” for the agricultural and rural development of the village Variogan and for the financial support of its citizens.
Nizhnevartovsk region, KhMAO. In the village of Variogan public hearings have been held on the project of the construction of gas pipeline “Preliminary Water Removal Unit of Zapadno-Varioganskoye oilfield – Pump station-3 “Varioganskaya” with supply pipeline of booster station – Roslavlskoye oilfield – tie-in-point”. The project of OAO “Varioganneft” plans the construction of gas pipeline with a total length of approximately 94 km.
Izhevsk. OAO “Belkamneft”, a subsidiary enterprise of OAO NK “RussNeft”, has completed the planned preparations for the autumn-winter period 2011-2012. The Enterprise has performed the whole complex of works necessary to ensure continuous operation of energy economy and oil field equipment, the press-service of the company informs.
Saratov. At Alekseevskoye oilfield from horizontal well № 16 G of OAO “Saratovneftegas”, a subsidiary production enterprise of OAO NK “RussNeft”, there was received flush flow of water-free oil with daily flow of about 100 m3.
Saratov. Net profit of “Saratovneftegas” (a subsidiary of “RussNeft”, numbers among top ten largest Russian oil companies) in January-September of 2011, RAS increased 2.1 times – up to 2.33 billion rubles from 1.11 billion rubles in the same period of the last year, as stated in the company’s report.