© 2005–2026 ПАО НК «РуссНефть»

“Marem” is waiting for its pupils.

Grozny. After overall cosmetic repairs which was done with the help of teachers, schoolchildren and their parents, high school No 7 “Marem” is ready to receive its pupils.
01.09.2010 “Stolitsa plus” (Grozny, Republic of Chechnya)

“RussNeft assigned one million rubles for support of children’s and youth sports in the Saratov Region.

Saratov. OAO NK “RussNeft” assigned to the Saratov Regional Association of development of football and other sports one million rubles for arrangement of children’s mass competitions. The Association annually arranges a football tournament among neighborhood teams for the Governor’s Cup. Children’s and youth teams from all the districts of the Saratov Region.
01.09.2010 “Komsomolskaya Pravda-Saratov"

“Saratovneftegas” will sponsor the concert for children from orphan homes.

Saratov. In August, 31 at Saratov conservatory with OAO “Saratovneftegas” financial support a charity concert “France from children’s point of view” will be held for 450 children from 27 orphan homes and boarding houses.
31.08.2010 “Vsglyad –Info”

At "Varioganneft" there was held the IV show-contest among the emoloyees of Siberia region for the title "The best one in the profession at OAO NK "RussNeft"

Radizhny, KhMAO. At the production facilities of OAO "Varioganneft" there was held the IV show-contest among the emoloyees of Siberia region for the title "The best one in the profession at OAO NK "RussNeft" . About 50 employees from 6 enterprises of "RussNeft" : OAO MPC "Aganneftegasgeologia", (Novoagansk), OOO "Agan-Trans" (Novoagansk), OAO "Varioganneft" (Raduzhny), OAO "NAC "Aki-Otyr", (Khanty-Mansiisk), OOO "Zapadno-Malobalykskoye" (Nefteyugansk), ZAO "Tomskaya Neft" (Tomsk).
30.08.2010 "Samotlor-Express"

"Belkamneft": the economy of drilling. Interview of Y. Fedorov, general director of OJSC "Belkamneft".

Izhevsk. OJSC «Belkamneft», a subsidiary company of OJSC NK «Russneft», having introduced new technologies, improved wells drilling system, that made possible considerable reduction of drilling period. At Centralnoye oilfield of the company well drilling under the conductor was made for 32 hours, average mechanical speed of drilling during it was 45,3 m per hour, and full time spent for drilling and conductor fastening was 72 hours. The experiment took 1,3 twenty-four hours for drilling of conductor. This is a record-breaking result for Udmurtiya territory. This became the starting point of our interview.
24.08.2010 “Neftegazovaya vertical”